Piping & Equipment erection

GTI ensures that pipelines and equipment are correctly positioned and installed, whether the job involves fitting replacement pipes during a stop or putting in pipe spools as part of a new construction project.

Construction techniques
We construct columns from scratch, but we also regularly apply equipment dressing or vessel dressing. In such cases, we assemble the installation tower on the ground as far as possible and then erect it in the correct position on-site. Before the installations or pipelines are brought into operation, we carefully test all flange connections, gaskets and bolts in order to guarantee the maximum safety and quality of your production process.